There's paint on them there walls!

Moving right along on the house. Here's what's new:

-- Forced air heat is hooked up and has been tested. Done.

-- Most holes in the walls have the bulk of drywall patching done, though there is more to do.

-- The hardwood floor is in the new room. It should be sanded and get the first coat of finish on Monday.

-- Tile is in on the bathroom floor and shower walls. Grout is missing, but should go in next week.

-- Most of the painting in the bedroom is done. The big areas, at least, should all have two coats by now. Still some touch-up to do, and the trim may still need another coat.

Photos and positions are updated on the photo timeline.